Kenneth Chong WT 0 Report post Posted December 20, 2011 (edited) SBW - KCH SBW - KUL SBW - BTU SBW - MYY SBW - BKI that's all..... you missed 1...SBW-JHB... Edited December 20, 2011 by Kenneth Chong WT Share this post Link to post Share on other sites
Fairul 0 Report post Posted December 20, 2011 How many flights do they anticipate to be on apron at same time to warrant such a huge hall ? well said! i hope this expansion can be completed just in time before election. Nevertheless, I'm happy they decided to renovate SBW. I was there during the opening of this airport back in 1993/1994. memories Share this post Link to post Share on other sites
Mulyadir Fitri 0 Report post Posted December 20, 2011 How many flights do they anticipate to be on apron at same time to warrant such a huge hall ? Apparently, quite a lot of times. Also, SBW is the main diversion aerodrome for flights going into KCH, so the extra space will be welcomed. Share this post Link to post Share on other sites
BC Tam 2 Report post Posted December 20, 2011 Apparently, quite a lot of times Point taken - thanks for clarifying ! Share this post Link to post Share on other sites
prosibu1 0 Report post Posted December 20, 2011 3 A320 and 1 B737 at sibu airport apron is more shocking than new check in counter ... good pic Fitri! Share this post Link to post Share on other sites
Paul Ngu 0 Report post Posted December 20, 2011 If only they diverted those a330s ...that would be a sight... Share this post Link to post Share on other sites
Kenneth Chong WT 0 Report post Posted March 25, 2012 Some updates taken from SkyscraperCity... http://www.skyscrapercity.com/showpost.php?p=89625185&postcount=611 Share this post Link to post Share on other sites
Teo CK 0 Report post Posted March 25, 2012 Apparently, quite a lot of times. Also, SBW is the main diversion aerodrome for flights going into KCH, so the extra space will be welcomed. wow.... did not realise that SBW is this busy.... even the T1 at BKI can be quite empty at times.... Share this post Link to post Share on other sites
Tamizi Hj Tamby 1 Report post Posted July 31, 2012 Today (31/07/2012),marks a new chapter in history in Sibu as the new terminal is fully operational.The new terminal building was officiated by Dato' Sri Dr Wong Soon Koh,in a soft opening ceremony today. Looking forward for further info; I was unable to go there as I was busy with duty at the office. Share this post Link to post Share on other sites
Tamizi Hj Tamby 1 Report post Posted July 31, 2012 The new terminal building (from "I Love Sibu" FB Page) Share this post Link to post Share on other sites
Kenneth Chong WT 0 Report post Posted September 15, 2012 Taken from sibuericluk.blogspot.com....the Control Tower looks so much nicer than the one in KCH!!! Share this post Link to post Share on other sites
Tamizi Hj Tamby 1 Report post Posted September 15, 2012 The opening ceremony of the new terminal buildinh will took place before PM heads to Bintulu tomorrow. Share this post Link to post Share on other sites