  1. news from weibo said last contact is with Ho Chi Minh traffic control... FB said some fly passenger already contact with family
  2. Update Image from BinaPuri Website date 20 August 2013
  3. hard to open partially, due to main terminal Section 2 (S2) still not complete, it include all system Departure, arrival, also custom and immigration.
  4. Also as a backup control tower..MAHB mention before.
  5. Airasia and other airline hanger, maybe include cargo
  6. update from binaPuri website, date is around 23 May.
  7. issue delay more in design change after AA requirement (bigger capacity and runway.).BHS/Aerobridges just part of issue..also Malindo join at 2012.
  8. Increase in building size is to handle more passenger traffic up to 45 million, but base on MAHB forecast, KLIA2 will reach 45m passenger traffic in 2028+-. event Airasia forecast KLIA 2 can reach 45m passenger traffic in 2020. seriously event i thinking KLIA2 is a bit small ...... Don't think taxiway is un-piled, maybe we can see the construction photo weather is piled or not.
  9. If follow the klia2 project, final revised design only fix on 4th quarter 2010 after add new requirement from Airasia... 1st design is in 2009. construction just 2 year++ from 2011 to now reach 90% progress is quite good for an airport project, just MAHB over optimist on opening date.
  10. new progress image from BinaPuri website,
  11. new picture form binapuri website, picture should be taken on last week of March
  12. only have 31/1 from UEM builder look ceiling very low
  13. should be very hard, better pay RM2 take ERL from KLIA to new LCCT.
  14. from UEM Builder web just feel ceiling too low ... look right door and ceiling high, also rear door this angle ceiling look ok feel ceiling is quite low at BHS.
  15. KLIA2 Operational By Early June, Says Abdul Rahim KOTA KINABALU, March 17 (Bernama) -- Deputy Transport Minister Datuk Abdul Rahim Bakri said he is confident KLIA2, the new low-cost airport, will be ready and operational by early June this year. He said construction is over 80 per cent completed with the third runway already paved, adding airport operator Malaysia Airports Holdings Bhd (MAHB) and implementing teams are working day and night to ensure the works are completed on schedule. "Based on the briefings and my working visit to the KLIA2 construction site on Friday, I have full confidence that the high-impact national project will be operational in early June as scheduled," he told Bernama here today. Abdul Rahim said the airport will spur the nation's airline industry and make Malaysia the premier tourism destination in Southeast Asia. "Air Asia and Malindo Airways, which will begin operations later this month, will be KLIA2's anchor airlines, besides other low-cost airlines like Tiger Airways and Cebu Pacific. "The airport's RM4 billion development cost is said to be cheap compared to other airports in the world, the quality is good, and it employs local consultants, project managers and contractors," he said. http://www.bernama.com/bernama/v7/newsindex.php?id=935061
  16. OKok, u see #888, the left building is main parking building. not sure can complete at June or not. hopefully can make it.
  17. Just wait and see, MAB is project owner, they should be more info on progress compare to PKR, new runway MAB early already said only ready end of Year. as long main pubic parking, main terminal and half satellite plus half of Apron ready should be ok to used liao. current LCCT only 32 gate KLIA2 have 72 gate.
  18. First ERL approaching KLIA2...undergone test run Shared by Mr. Siva
  19. without tower still should be ok, 3th runway only ready on December, plane at KLIA2 still need taxi to KLIA runway to take off. but new tower also used for plane ground traffic control. anyway MAB say KLIA2 will complete at May, than start testing and commission before 28 june. new photo from Binapuri website, photo taken date should be 21/2
×
×