can, include B737, but A330 can't.
-
Update Image from BinaPuri Website date 20 August 2013
-
hard to open partially, due to main terminal Section 2 (S2) still not complete, it include all system Departure, arrival, also custom and immigration.
-
Also as a backup control tower..MAHB mention before.
-
Airasia and other airline hanger, maybe include cargo
-
update from binaPuri website, date is around 23 May.
-
issue delay more in design change after AA requirement (bigger capacity and runway.).BHS/Aerobridges just part of issue..also Malindo join at 2012.
-
Increase in building size is to handle more passenger traffic up to 45 million, but base on MAHB forecast, KLIA2 will reach 45m passenger traffic in 2028+-. event Airasia forecast KLIA 2 can reach 45m passenger traffic in 2020. seriously event i thinking KLIA2 is a bit small ...... Don't think taxiway is un-piled, maybe we can see the construction photo weather is piled or not.
-
If follow the klia2 project, final revised design only fix on 4th quarter 2010 after add new requirement from Airasia... 1st design is in 2009. construction just 2 year++ from 2011 to now reach 90% progress is quite good for an airport project, just MAHB over optimist on opening date.
-
MAS B772 Fleet Decommissioned on 27 January 2016
Wi Ching replied to alberttky's topic in General Aviation
I think MAS will buy A350 .... -
new progress image from BinaPuri website,
-
new picture form binapuri website, picture should be taken on last week of March
-
only have 31/1 from UEM builder look ceiling very low