Jump to content
MalaysianWings - Malaysia's Premier Aviation Portal
Sign in to follow this  
Tom/PER

OD 9M-LNY inflight engine shutdown - Feb 17

Recommended Posts

I heard of the deviation at the time back in late February but was unaware of the reason behind it.

 

Think this one was avoided any media scrutiny or exposure.

 

Unusual occurrence for a relatively new airframe.

 

http://avherald.com/h?article=4a75d349&opt=0 (may have to cut and paste)

 

Why would it take 30+days to replace quite a common engine could it of possibly been an uncontained failure and/or completed a overweight landing?

 

This explains why -LNY is currently sporting a Batik thrust reverser cowling.

 

 

Share this post


Link to post
Share on other sites
Sign in to follow this  

×
×
  • Create New...