Tom/PER 0 Report post Posted May 29, 2017 I heard of the deviation at the time back in late February but was unaware of the reason behind it. Think this one was avoided any media scrutiny or exposure. Unusual occurrence for a relatively new airframe. http://avherald.com/h?article=4a75d349&opt=0 (may have to cut and paste) Why would it take 30+days to replace quite a common engine could it of possibly been an uncontained failure and/or completed a overweight landing? This explains why -LNY is currently sporting a Batik thrust reverser cowling. Share this post Link to post Share on other sites
Mohd Suhaimi Fariz 2 Report post Posted May 29, 2017 Could be OD didn't have spare engines and the 30+ days are needed to procure a new engine? Share this post Link to post Share on other sites