Malaysian Airport Infrastructure Development News

Recommended Posts

Fiarul, thanks for sharing those insight of KLIA development :good:

Share this post


Link to post
Share on other sites

Fairul, thanx for the updated pix and info from KLIA. I suppose tht the upper deck will get to see the whole satelite building interior :clapping: Awesome construction..........................can't wait to use it!!! :drinks:

 

Share this post


Link to post
Share on other sites

Thanks for the exclusive updates Fairul. Nice to see KUL is expanding. Hope it will not be at the expense of Observation Hill. But then it may create more spotting locations elsewhere.

Share this post


Link to post
Share on other sites
Fairul, thank you very much for the update. :good:

Do keep us posted for the switching of runway ...

 

at the moment..the contractor just completed rectifying problems with the sensor loops at C4 and C5...so now, all AGL works are completed...PAPI/ILS calibration flight took place few days ago...so now we're waiting for the completion of the widening of TWY E3...only then runway 2 will be open for full operation..i will try to get the exact date since the date keep on changing...

 

here's some more update...its like writing weekly report..hehehe

 

EGR Work - few changes have to be made for the existing EGR...so the specialist have to dismantle parts of it and widen it to accomodate the big daddy...schedule to complete next month..

 

P3050010.jpg

the small thing ( the alien look-alike with four tiny thin legs) will be drilled into the PQC (apron) and it will act as a base for the EGR parts...

P3050007.jpg

 

P3050011.jpg

 

Building work- carpeting for C17

 

P3050021.jpg

 

P3050022.jpg

 

Share this post


Link to post
Share on other sites

Yay, C17 almost finish! B)

Fairul, can bring me inside ka? hehe

Edited by Nick R.

Share this post


Link to post
Share on other sites

since A380 is the hot news today...might as well post the progress of C17..the seats are ready..still look the same right?..except for the colorful sofas..

 

DSC06139.jpg

 

DSC06140.jpg

Gate C17 is almost ready ( passenger level)...

 

DSC06137.jpg

 

.The work for C27 and C37 started few months already. The photos above is the work for C27 hammerhead building. The existing hammerhead will be connected to the new hammerhead building. As you can see in the photos, the new columns has been erected already and now they're working on the beam

Share this post


Link to post
Share on other sites

Interesting choice of color for the seats. Love the interior, not in relaxing mood thou.................Construction really fast, wonder when will the first A380 dock :pardon:

Thanx for the update Fairul, more update plz :p

Edited by Seth K

Share this post


Link to post
Share on other sites
Look Like The Nice Kuala Terengganu Airport Expension construction already started.. :good:

Already started? :) Actually almost completed. I've been to the current "crowded" airport twice to pick up a friend of mine. They should begin the exterior painting soon. And it's designed by Raja Bahrin btw (yay!), since I'm quite bored with the copycat design of KLIA in MYY, KCH, BTU, etc.

 

Share this post


Link to post
Share on other sites
"Paging Tan Sri Ting ....... paging Tan Sri Ting ............. " !! :rolleyes:

 

Oh I forgot, this is in Sarawak - the ink on Global Upline's contract probably already dried !

Only this time, they will get the job done in 6 months or less ! :rolleyes:

LOL, enough oredi lor, he completed MYY, BTU, KCH and recently BKI-T2. A good clean few millions of ringgits of net profit. Ok what?

 

Luckily BKI-T1 not awarded to him.

 

Share this post


Link to post
Share on other sites
Already started? :) Actually almost completed. I've been to the current "crowded" airport twice to pick up a friend of mine. They should begin the exterior painting soon. And it's designed by Raja Bahrin btw (yay!), since I'm quite bored with the copycat design of KLIA in MYY, KCH, BTU, etc.

 

Unfortunately they started the wrong way, as usual concentrating on the terminal first. The runway is still short and there is still no ILS for safety.

 

Share this post


Link to post
Share on other sites
Unfortunately they started the wrong way, as usual concentrating on the terminal first. The runway is still short and there is still no ILS for safety.

 

 

But I thought the runway in MYY and BTU has already been completed?

 

Which leaves KCH runway still in progress. Btw.... you mean right now there is no ILS for the KCH runway? is it because of the construction going on?

Share this post


Link to post
Share on other sites
But I thought the runway in MYY and BTU has already been completed?

 

Which leaves KCH runway still in progress. Btw.... you mean right now there is no ILS for the KCH runway? is it because of the construction going on?

 

If you read carefully, he's talking about a different airport.

 

Share this post


Link to post
Share on other sites

TGG is the last major airport in Malaysia without ILS.

 

During the past 15 years:

 

Totally new airport: SBW, KLIA, TWU, BTU.

Runway lengthening: MYY, SBW, AOR, LGK.

ILS addition: LBU, MYY,AOR, KBR (plus at new airports)

Share this post


Link to post
Share on other sites
Luckily BKI-T1 not awarded to him.

That may or may not be the case, we won't be able to tell until WCT has completed T1 and we have a chance to compare.

 

However, my impression is that T2 is either still facing teething problems or already having problems per se. There was one day when power blackout caused operations to come to a complete halt, no backup power generation. Yesterday saw rainwater pouring out from one corner of the building with drippings from the ceiling at other spots. And the main car park was starting to flood !

 

Oh dear !

Share this post


Link to post
Share on other sites
That may or may not be the case, we won't be able to tell until WCT has completed T1 and we have a chance to compare.

 

However, my impression is that T2 is either still facing teething problems or already having problems per se. There was one day when power blackout caused operations to come to a complete halt, no backup power generation. Yesterday saw rainwater pouring out from one corner of the building with drippings from the ceiling at other spots. And the main car park was starting to flood !

 

Oh dear !

 

my friends received an email that contain defect photos from BKI T2....top be honest..the workmanship..very poor :(...the contractor (Global Upline SB) managed to complete the terminal way ahead of schedule but at the expensed of the quality....now i start to wonder if they have any QA/QC engineer....

 

Share this post


Link to post
Share on other sites

Can anybody confirm 32L/14R will be reopen on April 1st?

Share this post


Link to post
Share on other sites
Can anybody confirm 32L/14R will be reopen on April 1st?

 

from our meeting last week...ILS still in progress yet...after that..'cooling' period for 7 days...so..most prbably around 10 April 2007 onwards.....

 

Share this post


Link to post
Share on other sites

Thanks Fairul. Now must enjoy all the 32R landings while it lasts.

Share this post


Link to post
Share on other sites
In Sabah context, what are those ? :D

 

Quality Assurance/Quality Control Engineer...

Share this post


Link to post
Share on other sites

:D I know ! :D

 

What I meant was, do these professionals exist/practise or generally taken seriously over here in Sabah ? In light of what we were discussing earlier - local workmanship !

Share this post


Link to post
Share on other sites

As i'm sitting up in the tree...just wondering...any plans for KLIA's new sattelite terminal?..MTB - low cost carriers...Sattelite 1 - MAS and Satellite 2 - all other international airlines...and scrap the whole low cost terminal thing.. :pardon:

Share this post


Link to post
Share on other sites
scrap the whole low cost terminal thing.. :pardon:

 

What about the LCC, AirAsia? :pardon: :huh: